The Pembina Institute has reviewed the Ontario Power Authority’s Integrated Power System Plan Discussion Paper 2 – Load Forecast. In general, the Pembina Institute believes that the forecast likely overestimates future electricity demand in Ontario, and at best underestimates the risks associated with basing electricity system planning on long-term projections of future economic activity.
Ontario Integrated Power System Plan: Discussion Paper 2: Load Forecast
Pembina Institute Comments
October 2, 2006
Publication
Tags:
Programs
Leading the transition to clean energy requires advancing solutions to today’s energy challenges from various angles.
The Pembina Institute has spent four decades working to reduce the environmental impacts of Canada’s energy production and to provide actionable ideas on how to implement clean energy.